Kimberly-Clark, Barrow-in-Furness
External concrete slabs alongside the Kimberly-Clark site in Barrow-in-Furness.

About the project
Concast Concrete Flooring carried out external concrete work at the Kimberly-Clark site in Barrow-in-Furness.
The photographs show the stone formation prepared ahead of the slab, edge formwork set along the fence line, and a concrete slab cast in bays alongside the building.
Project details
- Formation prepared on stone
- Edge formwork
- Concrete slab cast in bays